Chester County Wastewater. Recovery, SC

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Keck & Wood completed the preliminary engineering report for the replacement of Chester County Wastewater Recovery’s Regional Sewer Pump Station No. 2, which included designing a 9,000-foot, 14-inch force main and a 1,900 GPM submersible pump station with variable speed drives and an emergency generator. The company also overhauled Chester County’s wastewater treatment plant specifications and details in 2014. Additionally, Keck & Wood performed various repairs at the Sandy River and Rocky Creek WWTPs, including replacing valves, pumps, weirs, scum beach, drain valves, and sluice gates.