Atlanta Metro State College

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

The project involved removing 25,000 cubic yards of fill dirt from the embankment between Metropolitan Parkway and campus buildings, relocating it to create a level central lawn for student use and outdoor events. Walkways were redesigned to meet ADA requirements, and a new concrete and paver plaza was built, along with improved lighting and landscaping. The primary campus roadway was widened and reconstructed, while a gravel parking area was transformed into a paved lot with 135 stalls, completing the project in 2017.