


Client Name
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Project Type
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Services Provided
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
The Flippen Trail culvert replacement project was an emergency stormwater project which replaced a failed triple 60” corrugated metal pipe culvert with stacked stone headwalls. KW provided a cost-effective design alternative that reduced impacts to adjacent property owners and complied with relevant State, County and City guidelines. The design also included a no-rise certification, proposed HEC-RAS models, HEC-RAS report and construction plans for the proposed two 66” and one 84” concrete pipe (embedded 18” for aquatic passage) and custom cast-in-place 15’ tall headwalls.