Saida Roundabout

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

The sketch plans prepared by Keck & Wood show that the westernmost Baxter Hood Center entrance (Intersection #13A) would be disconnected from Baskins Road, while the campus loop road would instead tie in from the south (Intersection #13B). Once the campus loop road is connected to Baskins Road (Intersection #13B), the Entrance North of Building C (westbound approach of Intersection #6) is planned to be disconnected from Baskins Road. In Figure 4.1B, a mini-roundabout is shown at the Baskins Road/Hood Center Drive intersection (Intersection #15) for illustrative purposes, as an alternative to the unsignalized, two-way stop control intersection.