Saida Roundabout

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

York Tech and Keck & Wood plans to modify the campus roadway network along Baskins Road, as illustrated in Figures 4.1A and 4.1B. The proposed changes include disconnecting the westernmost Baxter Hood Center entrance (Intersection #13A) from Baskins Road and rerouting the campus loop road to connect at Intersection #13B. Additionally, a mini-roundabout is proposed at the Baskins Road/Hood Center Drive intersection (Intersection #15) as an alternative to the current two-way stop control.