Gifford Pump Station Rhab, Gifford SC

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Keck & Wood provided design, specifications, and construction administration services for the rehabilitation of the Gifford Lift Station, which handles all wastewater for the Town of Gifford. The project involved replacing old pumps and valve vaults with new 25 HP pumps and an above-grade piping configuration, along with installing a retaining wall for improved operation and maintenance. KW also provided a Preliminary Engineering Report (PER), project narrative, budget, schedule, and site inspections.