Pilot Testing – Kingstree & Buford

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Keck & Wood, Inc. is leading the replacement of a 2.5 MGD drinking water treatment facility, including the preliminary engineering report, design, pilot testing, and construction contract administration. The existing facility, operational since 1934, is being upgraded with a new raw water main, improved pump station, and a future-expandable membrane filtration system, following successful pilot testing in 2018. Additional improvements include finished water storage, solids handling, backup power, and an upgraded SCADA system, ensuring the City meets its drinking water needs for the next 30 years.