Janus Industrial, GA

Client Name

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Type

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Services Provided

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Keck & Wood collaborated with Janus to orchestrate the piping of approximately 991 feet of intermittent stream on the western side of the Industrial Park. An offsite mitigation site was identified to offset the net loss of stream at the impact site. The mitigation site was then reserved for future conservation by the local chamber of commerce.

The Keck & Wood team designed the site improvements which included site grading, curb & gutter, heavy duty asphalt parking lots, striping, stormwater detention facilities, water quality improvements, landscaping, loading dock, storm sewer, sanitary sewer, water and electrical services.